Independent Engineer services for 4- laning of Sambalpur – Baragarh-Orissa/ Chhatisgarh Border Section of NH 6 (km 0.00- km 88.00) in the State of Orissa to be executed as BOT (Toll) basis on DBFOT Pattern under NHDP-III


...

Project Details

Title:

Client:National Highways Authority of India

Duration: 36 months

Cost:9090 million

Project Description

• Length = 88.00 km. (4 lane) • 6 major bridges: (25x30.40+2x10)m. (1x90)m. (7x12.40)m. (11x16.0)m. 1x10.5m.+7x33.5m.+10.5m.) (3x21)m, Minor bridge: 13nos.• 1 Bypass 7.30 km, 3 nos. ROB