Project Details
Title:
Client:M.P. Public Works Department
Duration: 18 Months
Cost:1396.42 million
Project Description
"MPPWD has decided to engage consultant for supervision and quality control on construction of identified roads / Bridge projects in the Rewa Zone (MP) under jurisdiction of Chief Engineer stationed at Rewa (MP). Total number of work in Rewa zone, total length of roads are 78.34 km. The project works are basically comprises of up gradation, strengthening and rehabilitation of roads and bridges. Most of the roads are either State Highway or Major Roads. The project includes construction of flyover on Sirmour Chowk of total length 725 m ( Bridge length 575.5 m having
span arrangement as – 1x60 m + 11 x 13.5 m + 11 x 25 m + 8 x 11.5 m) with Pile/ Open Foundation
"