Project Details
Title:Rehabilitation and upgradation of Zirakpur to Patiala Section of National Highway-64
Client:Ministry of Road Transport and Highways
Duration: 66 months
Cost:6870 million
Project Description
"The project road falls in district Patiala in Punjab. The alignment of existing road runs ion plain terrain with green field all around. The total length of road is 50Km. the construction work has got carried out by EPC Contractor M/s entrodorstroy in both the sections of road. The existing two lane width road has been rehabilitated and upgraded to 4 lane. The tructures Total Length – 17.75 km.( 4 lane); Package I – 8.20 Km.; Package II – 9.55 Km.
"