Highways "Consultant services for Preparation of Detailed Project Report for development of Dungerpur-Sagwara- Banswara Highway SH-10 (Km 20/0 to Km. 125/0) (Length- 105. km. 2 lane)" Rajasthan State Road Development & Construction Corporation Limited. 12 months 1704.03 million "The project road is a section of SH-10 (Kharagpur – Dungarpur - Sagwara – Banswara). The road starts from Km. 20 near Dungarpur and ends at km 124 of SH-10 meeting NH-113 (near Banswara). The length involves in project road is 10.3.982 km. and major pat of it parses through rolling terrain and some part runs on finally terrain. The existing road is 5.5 m in width. Present condition of the road in about 22 km is poor and the rst is satisfactory. There exists 3 major submersible bridge and 8 minor bridges along with 179 culverts which needs replacement with new RCC structures CD structures are hydrologic ally inadequate and to be constructed widening / reconstruction have been proposed for 17 structure of minor bridges, Rehabilitation of 2 nos. of major bridges and reconstruction of 3 nos. of major bridges. Geometric improvement in grade as well as on curves are required to be done. The proposed road is to be widened to 7 on width with hard shoulders. The project cost is 170.43 crore." Project/noimage.jpg NULL Detailed Project Report


...

Project Details

Title:

Client:Rajasthan State Road Development & Construction Corporation Limited.

Duration: 12 months

Cost:1704.03 million

Project Description

"The project road is a section of SH-10 (Kharagpur – Dungarpur - Sagwara – Banswara). The road starts from Km. 20 near Dungarpur and ends at km 124 of SH-10 meeting NH-113 (near Banswara). The length involves in project road is 10.3.982 km. and major pat of it parses through rolling terrain and some part runs on finally terrain. The existing road is 5.5 m in width. Present condition of the road in about 22 km is poor and the rst is satisfactory. There exists 3 major submersible bridge and 8 minor bridges along with 179 culverts which needs replacement with new RCC structures CD structures are hydrologic ally inadequate and to be constructed widening / reconstruction have been proposed for 17 structure of minor bridges, Rehabilitation of 2 nos. of major bridges and reconstruction of 3 nos. of major bridges. Geometric improvement in grade as well as on curves are required to be done. The proposed road is to be widened to 7 on width with hard shoulders. The project cost is 170.43 crore."