Design & Construction Supervision for Road over Bridge including preparation of estimate, BOQ, technical specification, bid documents, detail design and preparation of all working /construction drawings, getting proof checked of design and drawings from IIT, Quality control complete as desired in scope of work for ROB at LC No. 88B at Chittorgarh and LC No. 139 at Bikaner.


...

Project Details

Client:IRCON International Limited

Duration: 28 Months

Cost:406.20 million

Project Description

Government of Rajasthan has taken a big leap to convert the existing rail level crossings in RoB’s urban areas in order to facilitate the easy flow of
vehicular traffic. Consequent upon it, the GoR has sanctioned many number of ROB’s in Raj